Thermal Plant Simulation
How a High Fidelity Thermal Plant Simulation Package Can Help Your Engineering Group Keep Your Plants at Peak Productivity?
Tetra Engineering provides a full-scope service for the modelling and operation analysis of all types of natural or forced circulation Power Boiler and HRSGs, including supercritical and once-through designs.
Tetra Engineering provides a full-scope service for the modelling and operation analysis of all types of natural or forced circulation Power Boiler and HRSGs, including supercritical and once-through designs. This can be integrated into a full plant model to incorporate the steam turbine and steam cycle balance of plant. The level of detail can be adapted to focus on local effects (e.g. row-to-row temperature differences) and can be steady-state or time-dependent, the latter to model transients such as startups. The state-of-the-art Power Plant Simulator and Designer™ (PPSD) software package developed by KED software is the primary tool for this work. Frequent applications at Tetra Engineering include:
Stay up to date and refer to our large collection of technical white papers and articles
How a High Fidelity Thermal Plant Simulation Package Can Help Your Engineering Group Keep Your Plants at Peak Productivity?
Many combined cycle power plants have experienced thermal shock damage to bypass power piping, especially in the HP steam and Hot Reheat systems.
If your plant suffers from frequent failures, installing additional thermocouples can prove to be invaluable when assessing the actual root cause of the failures.
Tetra Engineering and KED are pleased to announce the release of the Power Plant Simulator & Designer Package (PPSD) Version 19.1. PPSD is a state of the art design and analysis/troubleshooting package for nearly any type of thermal power plant. It includes the capability for both steady state and dynamic simulation and analysis and is developed by KED in Germany.