Adding a stack damper will reduce the amount of humidity reaching the interior of the unit.  The damper will also reduce cyclic stress from thermal expansions and to reduce start times after a short shutdown because it greatly reduces cooldown rates.  The following points should be considered:

Gas-side corrosion occurs during shutdown.  It is highest in the cold-end tube sections because of the presence of acidic deposits.  Cold-end corrosion is particularly active in cycling units because the deposits are initially hygroscopic, air condenses on the tubes and forms acids that greatly accelerate the corrosion process.  If the Power Station is located in a dry climate there ill be lower risk than in some other locations; corrosion is very dependent on the ambient humidity (Figure 1). 

  • Dampers should fail open
  • Control system should ensure damper is open prior to and during purge and GT operation
  • Heat will migrate from module to module. However, as there is little gas flow the heat transfers reduce so that temperature rises in the LP system will be minimal.

Another option to minimize heat loss is to seal the turbine end of the system. If there is no internal system already installed then this can be done by curtaining the GT intakes.  A convection circuit will still be set up in the stack but this will still maintain higher temperatures for longer periods than without this curtaining.

If a stack damper is in place then gas path corrosion can be further reduced by installing an industrial dehumidifier.  The unit should include built-in heater and air filters and have sufficient capacity to exchange five gas path volumes within one day.  Unit should allow turndown to lower output to operate in a keep-dry mode.  The direction of flow is not particularly important although a common approach is to inject dry air into the cold end (one plant has duct going into modified access door) and circulate in counter flow to exit at transition duct.  A hygrometer should be installed to monitor circulating air discharge humidity. 

The key to successful dry layup is to assure that nearly all moisture is removed from the HRSG upon shutdown.  This is done by draining and venting the unit while still sufficiently hot, typically with drum pressure of at least 25 psi.  The remaining moisture is removed by recirculating air that is dried using an industrial dehumidifier or by placing desiccants at accessible locations (steam drums, condenser hot well) in the boiler loop.

Besides a longer time to restart, other disadvantages include:

  • The need to have either a source of dehumidified air or the need to distribute and occasionally exchange desiccant in the system,
  • Hot draining may not assure that all sections are fully dry. Significant amounts of moisture can remain at certain locations; these will corrode until dried out,
  • Monitoring of humidity within the system and airflow (for dehumidifiers) is required.
Book a free consultation

Our goal is to protect the value of your investments and improve the performance of your assets.

Contact Us

Related Whitepapers

Stay up to date and refer to our large collection of technical white papers and articles

No items found.

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us