Stay up to date with our latest news articles


.jpg)
Since 2007 the ASME B31.1 Power Piping Code has included Chapter VII, establishing mandatory requirements for Operation and Maintenance. The key elements of this program are discussed here, and require that Operators outline a detailed maintenance plan for their Covered Piping Systems (CPSs). The Code also requires that operators perform regular Condition Assessments of their CPS ensuring that relevant degradation mechanisms are being covered.
.png)



Since 2007, the ASME B31.1 Power Piping Code has included mandatory requirements on the Operation and Maintenance (O&M) of Covered Piping Systems (CPS), previously called High-Energy Piping. The main concern is that the safety of these systems is very dependent on good O&M, which justifies its inclusion in the Construction Code. There is room for flexibility depending on individual circumstances but the responsibility is squarely laid on the Operating Company.


Higher demands on outlet steam conditions have led to increased use of modified low alloy materials (9-12% Cr), such as Grade 91. The superior high temperature properties of these steels give the designer advantages with respect to boiler reliability and thermal performance; however, their long-term integrity has been a concern to the industry ever since the first installations.

Tetra Engineering will once again be offering its popular HRSG training courses at a number of locations this year. Currently scheduled are sessions at several locations in the US as well as in France and in Dubai.Please click here for the full list of courses, dates, and locations
Consult our range of free resources