Resources

Consult our range of free resources.

Contact Us

Technical Guides

Tetra has published a series of guides which are available for ordering.

HRSG Inspection Planning Guide (2nd Edition)

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.

HRSG Tube Failure Diagnostic Guide (3rd Edition)

Heat Recovery Steam Generator (HRSG) tubes provide the media for extraction of useful energy from the waste heat in gas turbine exhaust at combined cycle power plants (GT-CCs) or from heat generated by process streams at petrochemical facilities.

Technical White Papers

A selection of technical papers available for reference.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Inspection Technology for Heat Recovery Steam generators (HRSG)

Inspection Technology for Heat Recovery Steam generators (HRSG)

In addition to selecting inspection technology, the group responsible for inspection must have a clear underst...

learn more
Pressure Boundary Inspection Quick Guide

Pressure Boundary Inspection Quick Guide

Effective HRSG inspections focus on damage mechanisms that could affect each of the specific components; not all components are susceptible to all damage types.

learn more
HRSG Inspections - The Key to Reliability

HRSG Inspections - The Key to Reliability

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspectio...

learn more
GT Upgrade Effects on HRSG Pressure Parts

GT Upgrade Effects on HRSG Pressure Parts

Tetra Engineering Group, Inc. (TETRA) has assisted the owners of natural gas-fired combined cycle plants with ...

learn more
HRSG Tube Failure Statistics

HRSG Tube Failure Statistics

Tetra Engineering Group, Inc. (TETRA) has assisted the owners of natural gas-fired combined cycle plants with ...

learn more

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us

Papers, Presentations and Articles

Selected papers, presentations and articles from major industry conferences and events.

Title
Author
What do HRSG tube failure statistics tell us?
What do HRSG tube failure statistics tell us?What do HRSG tube failure statistics tell us?
Misha Gadher & Mark Taylor
Modern Power Systems
Counterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGs
Counterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGsCounterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGs
Taylor M.
IMechE HRSG User Group 2022
Adapting Existing Thermal Desalination Plants to Produce Hydrogen
Adapting Existing Thermal Desalination Plants to Produce HydrogenAdapting Existing Thermal Desalination Plants to Produce Hydrogen
Malloy J.
2022 World Utilities Congress
Root Cause Failure Investigation of MSCV Drain Failures
Root Cause Failure Investigation of MSCV Drain FailuresRoot Cause Failure Investigation of MSCV Drain Failures
P. Jackson, A. Wholey, E. Tsai and D. Burns
ASME 2022 Pressure Vessels & Piping Conference
Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)
Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)
Fabricius A., Malloy J., Taylor M., Moelling D.
Proceedings of the ASME 2022 Power Conference

Previous Projects

With over 30 years of experience in power and industrial steam generation services, Tetra Engineering has along history of projects.

HP Bypass Finite Element Analysis, 2015
Europe

HP Bypass Finite Element Analysis, 2015

Tetra was engaged by a client to perform a finite element analysis of the HP Bypass valve reducer, using measured displacements as input. Results from a strain gauge/displacement survey showed a large strain effect occurring during the start-up of the boiler. Initially, both the left and right side strain gauges on the reducer showed compressive strain. During the start something triggered the reducer to experience tensile strain that differed in its intensity between left and right. The purpose of the study was to try to simulate the observed strain fields and determine the root cause.

Site Condition Assessment, 2015
South East Asia

Site Condition Assessment, 2015

A Tetra Senior Engineer visited a south east asian power plant site to make an assessment of the commissioning situation. The EPC engaged Tetra as they considered that their site work was being delayed due to lack of progress by the IPP to perform their scope of work.There was significant lack of communication between the two parties as well as discrepancies in the scope of work, which lead to schedule delays and cause of mutual blaming between parties.

High Energy Piping (HEP) Remaining Life Assessment (RLA), 2015
Europe

High Energy Piping (HEP) Remaining Life Assessment (RLA), 2015

Tetra was hired by a client to investgate the remaning life of the HEP on 3 units of a thermal power station. The plant intended to operate the units for another 100,000 hours. The scope of work entailed a piping stress analysis of the main steam and hot reheat lines, thermal stress analysis of the SH header outlet/main steam line and remaining life assessment (creep, fatigue, creep-fatigue) of critical areas based on inspection history and results from the pipe stress/finite element analysis. The figure shows time-dependent stresses and temperatures during start up.

Study of impact of cyclic loads on superheater tubes, 2015
Europe

Study of impact of cyclic loads on superheater tubes, 2015

During the shutdown of the unit at night, the HP bypass was kept open to maintain a vacuum in the steam turbine condenser in order to guarantee a faster start the next morning. Therefore, a small quantity of high pressure steam from the HP drum was flowing through the SH on the way to the HP bypass valve. The small HP steam flow takes the path of least resistance and only goes through tubes on one side of the unit, affecting their temperature. The temperature of the tubes on the other side change differently and a temperature difference of around 80°C can be seen 2 hours after shutdown. The CCGT owner engaged Tetra Engineering to investigate the impact of these resultant cyclic loads on the fatigue life of the tube to header welds. The study concluded that the temperature difference of 80°C between different tubes does not cause high enough fatigue stresses alone to be considered critical

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us