Resources

Consult our range of free resources.

Contact Us

Technical Guides

Tetra has published a series of guides which are available for ordering.

HRSG Inspection Planning Guide (2nd Edition)

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.

HRSG Tube Failure Diagnostic Guide (3rd Edition)

Heat Recovery Steam Generator (HRSG) tubes provide the media for extraction of useful energy from the waste heat in gas turbine exhaust at combined cycle power plants (GT-CCs) or from heat generated by process streams at petrochemical facilities.

Technical White Papers

A selection of technical papers available for reference.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Piping Hangers & Supports

Piping Hangers & Supports

Piping supports and hangers require routine inspection. Interferences with equipment or structures can c...

learn more
Reasons for Inspecting

Reasons for Inspecting

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspectio...

learn more
Flow Accelerated Corrosion (FAC)

Flow Accelerated Corrosion (FAC)

Background Tube thinning caused by flow-accelerated corrosion (FAC) is one of the most frequent causes of fai...

learn more
Grade 91 Steel

Grade 91 Steel

Background Early failures of components fabricated with Creep Strength Enhanced Ferritic (CSEF) Steels in con...

learn more
Duct Burners

Duct Burners

Excess air in the gas turbine exhaust allows the combustion of additional fuel via supplemental firing in the ...

learn more
HRSG Tube Failure Diagnosis

HRSG Tube Failure Diagnosis

Diagnosis of HRSG tube failure causes is not always straightforward. Sometimes, a relatively clear-cut c...

learn more

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us

Papers, Presentations and Articles

Selected papers, presentations and articles from major industry conferences and events.

Title
Author
Computer Simulation of HRSGs Can Improve O&M
Computer Simulation of HRSGs Can Improve O&MComputer Simulation of HRSGs Can Improve O&M
J.W. Malloy (Tetra), C. Daublebsky (KED)
Jun 1 , 2009, Power Magazine
Experience of using pumped casing insulation in an operating Heat Recovery Steam Generator
Experience of using pumped casing insulation in an operating Heat Recovery Steam GeneratorExperience of using pumped casing insulation in an operating Heat Recovery Steam Generator
Tetra Engineering
2008, POWERGEN INT., USA
Deaerator degradation: Managing remaining life and component replacement
Deaerator degradation: Managing remaining life and component replacementDeaerator degradation: Managing remaining life and component replacement
P.S. Jackson (Tetra ) and T. Acteson (Chugach Electric Association)
Sep 15, 2008, Power Magazine
Extend EOH tracking to the entire plant
Extend EOH tracking to the entire plantExtend EOH tracking to the entire plant
P.S. Jackson, D.S. Moelling (Tetra)
Mar 15, 2008, Power Magazine
FAC Analysis for Inspection
FAC Analysis for InspectionFAC Analysis for Inspection
M.J. Taylor (Tetra)
2007, Heat Recovery Steam Generator User Group, UK

Previous Projects

With over 30 years of experience in power and industrial steam generation services, Tetra Engineering has along history of projects.

HRSG Boiler Preservation Study, 2014
Middle East

HRSG Boiler Preservation Study, 2014

A CCGT power plant employed Tetra to perform a review of possible boiler preservation options within the context of the present and planned operating regime. The review relied on information supplied by the plant staff, Tetra field experience and latest industry trends and practices to identify the most promising strategy for preservation. The ideal solution for this client was Dry Layup that is systematically applied when it reaches the end of the standby period. This would require that resulting startup timing meets requirements imposed by the governing network operator.

Thermohydraulic Attemperator Study using PPS&D, 2014
Europe

Thermohydraulic Attemperator Study using PPS&D, 2014

The primary purpose of this study was to validate the effect of an interstage attemperator between two superheaters with respect to the primary superheater and primary reheater outlet steam temperatures. The CCGT in question had already had problems with creep failures of the P91 components, and needed to assure that exit temperatures did not exceed 570°C. Currently, the primary superheater outlet temperatures exceed 600°C at certain loads and the primary reheater temperatures exceed 590°C. Initial results were based on steady-state analysis, while final results included dynamic modeling of cold-, warm- and hot starts, as well as ramp up and ramp down. The study was performed using the software simulation tool PPS&D.

Stress Analysis Study of SH Section, 2014
South East Asia

Stress Analysis Study of SH Section, 2014

A CCGT Power Plant suffered repeated tube failures between 2003 and 2014 in the SH section of their boiler. Failures were exclusively located at the tube-header weld, at varying positions on the tube sheet. The client engaged Tetra Engineering to analyze the problem and simulate the existing stresses during various load conditions. The scope of work included a review of historical failures and metallurgical reports, operational data analysis, Finite Element Analysis (FEA) and Fatigue Analysis.

CFD Analysis of failed 180° Bend, 2013
Middle East

CFD Analysis of failed 180° Bend, 2013

A CFD study on one of the 4th quadrant pipe bends at a thermal power plant steam boiler was performed. The purpose of the analysis was to analyse the change in flow velocity due to an increase in the bend nominal size from 3” to 4”. The connecting pipe run was kept at 3” and standard expander/reducers are used to join the pipe with the bend. Input process parameters were taken from a PPSD model.

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us