Whitepapers

Piping Hangers & Supports

Contact Us
Table of Contents

Piping supports and hangers require routine inspection.  Interferences with equipment or structures can cause severe damage to piping supports as can unanticipated fluid transients such as waterhammer.  Since the function of piping supports is to accommodate dead weight and thermal expansion loads while maintaining a necessary amount of flexibility, it is important that piping supports be functioning as intended.  This means that spring supports should be operating in their designated travel cold-hot and that piping should be supported in both cold and hot conditions without being overloaded (i.e. topped out spring supports). Depending on the orientation of the support, it can also be “bottomed-out” if excessive weight/load is being carried.  Inspection histories should be carefully maintained to facilitate maintenance planning.  HRSG Piping includes steam and water piping from the HRSG to and from the steam turbine (and steam host for cogen units) as well as connecting piping in the HRSG proper. Also included is fuel piping for burners, and ammonia piping for SCR’s.  Connecting piping includes downcomers, distribution and collection manifolds in economizers and evaporators, attemperators, superheater/reheater crossovers and feed lines.  Other lines include vent and safety valve discharge lines.  While piping systems do not require frequent maintenance, there have been isolated reports of failure of all module hangers in one section of the HRSG. That experience is not typical. Damaged hangers (bent/broken) are most commonly associated with piping that is exposed to severe loads in excess of design operating conditions, such as desuperheater spray piping where condensate is flashing causing water/steam hammer or other connecting piping where similar phenomena have occurred [1]. 

Improperly designed pipe support systems can also result in excessive loads on the supports.   Other problems caused by improper pipe support operation include:

  • Excessive pipe stress and weld failures
  • Excessive nozzle reactions
  • Overloaded support structures and pipe attachments
  • Interference of pipe with adjacent piping and structures
  • Drainage problems
  • Plant personnel concerns about structural integrity and safety

Visual inspection is an effective technique for piping hangers and supports. 

Figure 1: Severly corroded hanger

Top-supported HRSGs typically use bolted drilled plate hangers for headers. Inspection of hanger supports has in some instances identified missing support pins or displaced pins.  Repairs have consisted of replacement of pins and/or welding of the pin to the plate. Inspections of HRSG headers can be performed whenever the penthouse or “attic” section of the HRSG is accessible. 

External piping supports should be inspected every 2-5 years.  The following conditions are of interest:

  • Topped out or bottomed out supports
  • Indicated position not within design range
  • Bent rigid rod supports
  • Bent structural steel associated with supports
  • Corroded or bent spring cans
  • Loose rod and clamp bolts
  • Lug weld cracks

Digital records of support conditions and spring settings can be obtained by digital cameras and digital binoculars. Preventive Maintenance (PM) programs for High Energy Piping provide a coordinated way to manage these risks. PipeVue 2.0 was been specifically developed by Tetra Engineering to store and organize the large amounts of inspection data associated with piping systems in one network-based solution, easily accessible for both plant operators as well as engineers planning yearly inspections. The software has modules covering not only Piping hangers & supports but also Flow-accelerated corrosion (FAC) inspection data, Welds (Weld inspection data), CARDS (Boiler components) and Operating History.

References

[1] Jackson, P. Moelling, D. Malloy, J. Taylor, M. HRSG Inspection Planning Guide - Second Edition, 2006. ISBN 0-9719616-2-X

Book a free consultation

Our goal is to protect the value of your investments and improve the performance of your assets.

Contact Us

Related Whitepapers

Stay up to date and refer to our large collection of technical white papers and articles

Power Boiler Piping
Whitepapers

Power Boiler Piping

Boiler piping design requirements is divided into internal and external jurisdictions. These are divided...

Learn more
Visual HRSG Inspections
Whitepapers

Visual HRSG Inspections

The predominant technique for inspecting HRSGs is visual. Visual inspection is performed at nearly every...

Learn more
HRSG Inspection Planning
Whitepapers

HRSG Inspection Planning

Building a good inspection plan for the HRSG involves doing the following: Set the Time and General Schedul...

Learn more

Contact Us

To discuss how we might assist you to improve your plant's performance or to maintain its value over time

Contact Us