tetra engineering company logo
  • Home
  • About us
  • Services
    • HRSG & Boiler Inspection Services
    • Engineering & Analysis
    • Power Piping Services
    • Project and Technical Expert Services
    • Drone Inspections
    • CSP Services
  • Training
  • News
  • Resources
    • Technical Guides
    • Technical White Papers
    • Papers, Presentations & Articles
    • Technical Project References
  • Software
  • Contact
  • Home
  • About us
  • Services
    • HRSG & Boiler Inspection Services
    • Engineering & Analysis
    • Power Piping Services
    • Project and Technical Expert Services
    • Drone Inspections
    • CSP Services
  • Training
  • News
  • Resources
    • Technical Guides
    • Technical White Papers
    • Papers, Presentations & Articles
    • Technical Project References
  • Software
  • Contact

Technical White Papers

  • HRSG Tube Failure Statistics
  • HRSG Tube Failure Diagnosis
  • GT Upgrade Effects on HRSG Pressure Parts
  • Reasons for Inspecting
  • HRSG Inspections - The Key to Reliability
  • HRSG Inspection Planning
  • HRSG Inspection Frequency
  • Inspection Technology for Heat Recovery SteamGenerators (HRSG)
  • Visual HRSG Inspection 
  • Remote Visual Inspection (RVI), or Borescope
  • Surface Replica Testing
  • Water Chemistry in HRSGs
  • Tube Failures related to Water Chemistry
  • HRSG Preservation
  • Gas Side Layup
  • Water Side Layup
  • Tube Failures Related to Layup
  • Sulphuric Acid Dewpoint Corrosion
  • Grade 91 Steel
  • Creep Classification of Grade 91 Steel
  • Power Boiler Piping
  • Piping Hangers & Supports
  • Welding Procedure Specification (WPS)
  • Duct Burners
  • Flow Accelerated Corrosion (FAC)
  • Tube Metallurgical Analysis
Services
About Us
Privacy Policy
Contact

©Tetra Engineering Group™ 2020 All Rights Reserved

Cookies & Privacy

This website uses cookies to ensure you get the best experience on our website. Privacy Policy

Accept