Life & Integrity Assessments

Services to determine the remaining life of your boiler, HRSG and other key components; to evaluate current or projected plant performance; to find the root cause of component failures.

Contact Us
Boiler and Steam Generation experts.

Analysis is Essential

Power and process plant equipment over time inevitably is subject to failures and deterioration with attendant loss of performance.  Understanding and predicting these events and phenomena requires experience, obtained through an extensive background in field inspections and in applying the appropriate desktop tools such as Finite Element Analysis (FEA), Computational Fluid Dynamics (CFD) and thermohydraulic process simulation.  Tetra Engineering provides a full scope of analytical services to help you assess what has happened or predict what will happen to your power plant components.

Our Life & Integrity Assessment Services

We can tailor our services to your needs

Life Assessments

Life Assessments

Knowing the remaining useful operating life of your boiler, HRSG and associated balance-of-plant is a key parameter for effective management of your thermal power plant.

learn more
Performance & Efficiency Assessments

Performance & Efficiency Assessments

Services to help you evaluate how your operating performance has changed since the plant / boiler was commissioning, or to help you check the potential performance impact of planned modifications before they are implemented.

learn more
Root Cause of Failure (RCA)

Root Cause of Failure (RCA)

Knowing the fundamental causes leading to failure is essential to mitigate the risk of the failure repeating. Tetra Engineering calls on an interdisciplinary team to assess the failure (or degradation) and determine the root cause.

learn more
Optimized NDE

Optimized NDE

Risk-based inspection (RBI) is an approach for ranking the priority of inspection and maintenance according to an assessed risk to the component or system integrity. One key aspect of any RBI program is to carefully select the locations for non-destructive examination (NDE) that are most susceptible to damage, according to the component's design and past and project operating mode, while considering the resources and time available during an upcoming inspection. Using multi-disciplinary experience and tools (thermal simulation, life assessment, structural calculations….) Tetra will help you get the most out of your NDE campaigns, by providing pre-outage planning, on-site supervision and post-inspection review.

learn more
Flow Accelerated Corrosion Assessment (FAC)

Flow Accelerated Corrosion Assessment (FAC)

Identify and prevent tube and pipe thinning caused by flow-accelerated corrosion (FAC) to avoid ruptures and leaks.

learn more
Boiler Process Modelling and Simulation

Boiler Process Modelling and Simulation

Tetra Engineering provides a full-scope service for the modelling and operation analysis of all types of natural or forced circulation Power Boiler and HRSGs, including supercritical and once-through designs. This can be integrated into a full plant model to incorporate the steam turbine and steam cycle balance of plant.

learn more
Fitness for Service

Fitness for Service

A fitness for service (FFS) evaluation is a process for assessing the structural integrity and safety of components that may have experienced damage and deterioration during their service life.

learn more

Recent Resources

Stay up to date and refer to our large collection of technical white papers and articles

Whitepapers

HRSG Tube Failure Statistics

Tetra Engineering Group, Inc. (TETRA) has assisted the owners of natural gas-fired combined cycle plants with ...

Learn more
Whitepaper

Flow Accelerated Corrosion (FAC)

learn more
Whitepaper

Tube Metallurgical Analysis

learn more
Duct Burner Deterioration in HRSGs: A Challenge for Power Plants
News

Duct Burner Deterioration in HRSGs: A Challenge for Power Plants

Duct burners operate in some of the most extreme environments, enduring hurricane-force winds and blistering temperatures round-the-clock. Inadequate or improperly engineered equipment often leads to issues such as failing or fractured on burners.

Learn more

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps