A fitness for service (FFS) evaluation is a process for assessing the structural integrity and safety of components that may have experienced damage and deterioration during their service life.

Contact Us
Fitness for Service

The goal of an FFS is to determine whether a component can continue to operate safely and with adequate performance, or if it needs repair, replacement, or modification. For power and process plant components, one usually uses the methodology set out in the ASME FFS-1/API-579 recommended practice guideline.

The boiler or HRSG is exposed to a variety of degradation mechanisms during operation and shutdown.  Regular inspection and good maintenance practice can minimise damage and degradation, but not eliminate it.  When damage is identified, what are your options? For pressure parts in critical service, where contract penalties apply, it may be desirable to delay repairs until the next planned outage or shutdown.

Tetra can provide a full range of services in the field of Fitness for Service assessments according to world recognised standards:

• API 579-1 / ASME FFS-1
• BS7910
• Fitnet
• B31.G
• DNV-RP-F101
• R5 / R6

Fitness for Service
Fitness for Service

The complexity and scope of an FFS vary according to the particular problem under investigation.  The first step in any FFS evaluation is to assess the extent and nature of the damage or degradation that the equipment or structure has undergone, such as creep, cracking, corrosion or mechanical deformation.  Based on this initial evaluation, the ASME/API approach then specifies three levels of analysis.  The level 1 assessment is the simplest and takes the least time. The analyst relies on experience coupled with use of some basic calculations and screening curves to make a judgment on the fitness for service.  Typically this approach is most conservative, similar to design code calculations.

If the level 1 results do not provide sufficient confidence or do not meet the required criteria for acceptance, then a level 2 assessment is performed.  This requires more complex analysis and calculations, such as finite element analysis (FEA).  The objective is to reduce the amount of "conservatism" in the analysis and thereby see if the component can be placed back into service.  Finally, if the result of the level 2 analysis still shows that a negative result, a level 3 can be attempted.  More elaborate analysis and data collection from inspection or laboratory tests are used to further lower the remaining conservatism in the level 2 results and thereby potentially show an acceptable result for the component.  In all cases the experience of the analysts is critical.  Tetra Engineering has performed numerous FFS studies on a wide variety of components in the boiler and steam generation cycle.  This provides the necessary assurance that we will deliver a suitably informed decision to clients on whether their component can continue to operate.

Fitness for Service

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter

Related Engineering & Analysis Services

Life Assessments

Life Assessments

Knowing the remaining useful operating life of your boiler, HRSG and associated balance-of-plant is a key parameter for effective management of your thermal power plant.

learn more
Performance & Efficiency Assessments

Performance & Efficiency Assessments

Services to help you evaluate how your operating performance has changed since the plant / boiler was commissioning, or to help you check the potential performance impact of planned modifications before they are implemented.

learn more
Root Cause of Failure (RCA)

Root Cause of Failure (RCA)

Knowing the fundamental causes leading to failure is essential to mitigate the risk of the failure repeating. Tetra Engineering calls on an interdisciplinary team to assess the failure (or degradation) and determine the root cause.

learn more
Optimized NDE

Optimized NDE

Risk-based inspection (RBI) is an approach for ranking the priority of inspection and maintenance according to an assessed risk to the component or system integrity. One key aspect of any RBI program is to carefully select the locations for non-destructive examination (NDE) that are most susceptible to damage, according to the component's design and past and project operating mode, while considering the resources and time available during an upcoming inspection. Using multi-disciplinary experience and tools (thermal simulation, life assessment, structural calculations….) Tetra will help you get the most out of your NDE campaigns, by providing pre-outage planning, on-site supervision and post-inspection review.

learn more
Flow Accelerated Corrosion Assessment (FAC)

Flow Accelerated Corrosion Assessment (FAC)

Identify and prevent tube and pipe thinning caused by flow-accelerated corrosion (FAC) to avoid ruptures and leaks.

learn more
Boiler Process Modelling and Simulation

Boiler Process Modelling and Simulation

Tetra Engineering provides a full-scope service for the modelling and operation analysis of all types of natural or forced circulation Power Boiler and HRSGs, including supercritical and once-through designs. This can be integrated into a full plant model to incorporate the steam turbine and steam cycle balance of plant.

learn more
Fitness for Service

Fitness for Service

A fitness for service (FFS) evaluation is a process for assessing the structural integrity and safety of components that may have experienced damage and deterioration during their service life.

learn more

Recent Resources

Stay up to date and refer to our large collection of technical white papers and articles

No items found.
Duct Burner Deterioration in HRSGs: A Challenge for Power Plants
News

Duct Burner Deterioration in HRSGs: A Challenge for Power Plants

Duct burners operate in some of the most extreme environments, enduring hurricane-force winds and blistering temperatures round-the-clock. Inadequate or improperly engineered equipment often leads to issues such as failing or fractured on burners.