Optimized NDE

Risk-based inspection (RBI) is an approach for ranking the priority of inspection and maintenance according to an assessed risk to the component or system integrity. One key aspect of any RBI program is to carefully select the locations for non-destructive examination (NDE) that are most susceptible to damage, according to the component's design and past and project operating mode, while considering the resources and time available during an upcoming inspection. Using multi-disciplinary experience and tools (thermal simulation, life assessment, structural calculations….) Tetra will help you get the most out of your NDE campaigns, by providing pre-outage planning, on-site supervision and post-inspection review.

Contact Us
Optimized NDE

By design, ASME pressure parts (piping and boilers) are intended to be inspected at regular intervals. While many damage mechanisms can be detected visually, others are best discovered with various NDE methods, in particular:

  • Fatigue cracking
  • Creep
  • Corrosion-assisted cracking
  • Flow-accelerated Corrosion

NDE contractors are expensive and usually don’t know your plant or process well enough to know which components are most at-risk for degradation and wear. If they inspect in the wrong places (i.e. where the rate of wear/damage is not highest), they’ll end up giving a false sense of security.

Optimised NDE means carefully selecting the locations that are most susceptible to damage, according to your components’ design and the way they are operated. Tetra Engineering has the requisite multi-disciplinary experience and tools (thermal simulation, life assessment, structural calculations….) in-house to help you get the most out of your NDE campaigns, by providing pre-outage planning, on-site supervision and post-inspection review.

Optimized NDE
Optimized NDE
Optimized NDE

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter

Related Engineering & Analysis Services

Life Assessments

Life Assessments

Knowing the remaining useful operating life of your boiler, HRSG and associated balance-of-plant is a key parameter for effective management of your thermal power plant.

learn more
Performance & Efficiency Assessments

Performance & Efficiency Assessments

Services to help you evaluate how your operating performance has changed since the plant / boiler was commissioning, or to help you check the potential performance impact of planned modifications before they are implemented.

learn more
Root Cause of Failure (RCA)

Root Cause of Failure (RCA)

Knowing the fundamental causes leading to failure is essential to mitigate the risk of the failure repeating. Tetra Engineering calls on an interdisciplinary team to assess the failure (or degradation) and determine the root cause.

learn more
Optimized NDE

Optimized NDE

Risk-based inspection (RBI) is an approach for ranking the priority of inspection and maintenance according to an assessed risk to the component or system integrity. One key aspect of any RBI program is to carefully select the locations for non-destructive examination (NDE) that are most susceptible to damage, according to the component's design and past and project operating mode, while considering the resources and time available during an upcoming inspection. Using multi-disciplinary experience and tools (thermal simulation, life assessment, structural calculations….) Tetra will help you get the most out of your NDE campaigns, by providing pre-outage planning, on-site supervision and post-inspection review.

learn more
Flow Accelerated Corrosion Assessment (FAC)

Flow Accelerated Corrosion Assessment (FAC)

Identify and prevent tube and pipe thinning caused by flow-accelerated corrosion (FAC) to avoid ruptures and leaks.

learn more
Boiler Process Modelling and Simulation

Boiler Process Modelling and Simulation

Tetra Engineering provides a full-scope service for the modelling and operation analysis of all types of natural or forced circulation Power Boiler and HRSGs, including supercritical and once-through designs. This can be integrated into a full plant model to incorporate the steam turbine and steam cycle balance of plant.

learn more
Fitness for Service

Fitness for Service

A fitness for service (FFS) evaluation is a process for assessing the structural integrity and safety of components that may have experienced damage and deterioration during their service life.

learn more

Recent Resources

Stay up to date and refer to our large collection of technical white papers and articles

No items found.
Silent Threat: Sulfuric Acid Corrosion in Combustion and Exhaust Systems
News

Silent Threat: Sulfuric Acid Corrosion in Combustion and Exhaust Systems

Sulfuric acid deposits in combustion and exhaust systems can silently damage equipment, reduce efficiency, and lead to costly downtime. Tetra Engineering’s advanced fouling assessment services identify the root causes of deposit formation and provide tailored solutions to keep your operations running smoothly. Protect your equipment, enhance efficiency, and ensure uninterrupted power generation with Tetra Engineering. Learn more today!

Learn more

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter