Actualités

Restez au courant de nos derniers articles de presse

Protecting Steam Cycle Components During Low-Load Operation of Combined Cycle Gas Turbine Plants

How low can you go? That’s the question owners of gas turbine combined cycle plants are asking these days as they are being called upon to operate those units for rapid response in markets where load following is becoming the norm. The resulting cyclic operation introduces challenges that can result in damage to steam cycle components if you aren’t careful.

learn more

Tetra In Action - May, 2016

Managing the Power Piping in CCGT Plants Risk of failure and attendant personnel safety concerns are always present when operating highly-pressurized systems.

learn more

Tetra provides services for Cement Industry Heat Recovery Systems

Tetra Engineering provides services to assist Cement Plant Owners and Operators in implementing, maintaining and improving all types of Heat Recovery Systems. Our Heat Recovery Steam Generator and steam cycle services have been applied to Rotary Kiln Waste Heat recovery power generation systems. Whether addressing problems with fouling, or assessing plant modifications for performance improvements, contact Tetra to reduce your energy costs and increase reliability.

learn more

2016 Training Schedule Announced!

Tetra Engineering has announced its schedule for HRSG Combined Cycle training events in 2016. This year we will be hosting training courses in Utah and Connecticut, USA, as well as in France and a new event in Dubai, UAE. See our training page for more details.

learn more

Tetra In Action #3 - June, 2016

Tetra Engineering announces a series of targeted workshops to provide thermal and process plant O&M engineers, managers and operators with a working knowledge in several aspects of the boiler and steam process technology.

learn more

Tetra In Action #4 - July, 2016

Come see us at the PowerGen Asia conference in Seoul! And read about Boiler Preservation Engineering...

learn more

How do GT Upgrades Impact your HRSG?

OEM upgrade packages to gas turbines (GT) can significantly improve performance, operational flexibility and increase outage intervals. In combined cycle power plants, the impact of these upgrades should also be considered for the HRSG where the design was based on the original GT performance.

learn more

Tetra in Action #5 - October, 2016

Read about Assuring HRSG and Boiler Pressure Part Quality, a Recent training Course and RVIs...

learn more

HRSG Tube Failure Guide, 3rd Ed.

The latest updated edition of Tetra Engineering's HRSG Tube Failure Diagnostic Guide will be published August 15, 2016. Thousands of combined cycle professionals are familiar with Tetra's HRSG Tube Failure Diagnostic Guide; first published during the 'bubble' in construction in the early 2000s.

learn more

Related Resources

Consult our range of free resources

HPSH Assembly

Papers, Presentations and Articles

A selection of papers, presentations and articles from major industry conferences and events.

Learn more

Technical Guides

learn more
SH Metallurgy

Technical Project References

A reference list of projects Tetra has been involved in.

Learn more

Technical White Papers

learn more
Tetra Engineering logo. Orange triangular pyramid on a black background.Tetra Engineering logo. Orange triangular pyramid on a black background.

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter