Covered Piping System Maintenance Programme

Contact Us
Table of Contents

Since 2007 the ASME B31.1 Power Piping Code has included Chapter VII, establishing mandatory requirements for Operation and Maintenance. The key elements of this program are discussed here, and require that Operators outline a detailed maintenance plan for their Covered Piping Systems (CPSs). The Code also requires that operators perform regular Condition Assessments of their CPS ensuring that relevant degradation mechanisms are being covered.

Tetra provides the following services to Owners and Operators of Combined Cycle and Thermal Power Plants:

  • Preparation of a B31.1 compliant CPS Maintenance Programme
  • Grade 91 and CSEF Risk Assessment
  • Fatigue Risk Assessment
  •  
  • Thermal Impingement/Shock Risk Assessment
  •  
  • Piping Support Inspection Programme
  •  

We additionally provide these programmes and the results from their associated Condition Assessments in the format of a digital, 3-dimensional, Knowledge Management System called PipeVue.

Book a free consultation

Our goal is to protect the value of your investments and improve the performance of your assets.

Contact Us

More News

Stay up to date and refer to our large collection of technical white papers and articles

ASME B31.1 Covered Piping Systems' Mandatory Requirements
News

ASME B31.1 Covered Piping Systems' Mandatory Requirements

Since 2007, the ASME B31.1 Power Piping Code has included mandatory requirements on the Operation and Maintenance (O&M) of Covered Piping Systems (CPS), previously called High-Energy Piping. The main concern is that the safety of these systems is very dependent on good O&M, which justifies its inclusion in the Construction Code. There is room for flexibility depending on individual circumstances but the responsibility is squarely laid on the Operating Company.

Learn more
Introducing PipeVue 2.0 KMS
News

Introducing PipeVue 2.0 KMS

PipeVue 2.0 was developed by Tetra Engineering to store and organize large amounts of inspection data in one network-based solution, easy accessible for both plant operators as well as engineers planning yearly inspections.

Learn more
2018 CPS Piping Services for CCGT Plants
News

2018 CPS Piping Services for CCGT Plants

2018 CPS Piping Services for CCGT Plants Tetra Engineering Group, Inc.has assistedmany owners of natural gas-fired combined cycle plants with the development of effective Covered Piping Systems (CPS) Programs, Inspection Plans, Pipe Stress Analysis and Field NDT since the ASME adopted the new Code requirements for piping O&M in Section B31.1 Chapter VII in 2007. Tetra has developedsuch programsfor CCGT owners in the US, Canada, Mexico and the Middle East. They have been prepared for 'bubble' 2x1 design with F-class gas turbines as well as modern 1x1 fast-start units, plants with aeroderivative GTs and once-through steam generators as well as smaller units operated by municipal power companies, some of which are in cogeneration service. Based on the latest B31.1 requirements, the CPS Program Plan is tailored to meet your requirements especially regarding the scheduling of NDT inspections over multiple outages to distribute costs and meet outage budget constraints Covered Piping systems O&M Programs for CCGT Plants

Learn more