Tetra a publié une série de guides qui peuvent être commandés.
Une sélection de documents techniques disponibles à titre de référence.
Sélection d'articles, de présentations et d'articles issus de conférences et d'événements majeurs de l'industrie.
Avec plus de 30 ans d'expérience dans les services de production d'électricité et de vapeur industrielle, Tetra Engineering a une longue histoire de projets.
A CCGT power plant employed Tetra to perform a review of possible boiler preservation options within the context of the present and planned operating regime. The review relied on information supplied by the plant staff, Tetra field experience and latest industry trends and practices to identify the most promising strategy for preservation. The ideal solution for this client was Dry Layup that is systematically applied when it reaches the end of the standby period. This would require that resulting startup timing meets requirements imposed by the governing network operator.
The primary purpose of this study was to validate the effect of an interstage attemperator between two superheaters with respect to the primary superheater and primary reheater outlet steam temperatures. The CCGT in question had already had problems with creep failures of the P91 components, and needed to assure that exit temperatures did not exceed 570°C. Currently, the primary superheater outlet temperatures exceed 600°C at certain loads and the primary reheater temperatures exceed 590°C. Initial results were based on steady-state analysis, while final results included dynamic modeling of cold-, warm- and hot starts, as well as ramp up and ramp down. The study was performed using the software simulation tool PPS&D.
A CCGT Power Plant suffered repeated tube failures between 2003 and 2014 in the SH section of their boiler. Failures were exclusively located at the tube-header weld, at varying positions on the tube sheet. The client engaged Tetra Engineering to analyze the problem and simulate the existing stresses during various load conditions. The scope of work included a review of historical failures and metallurgical reports, operational data analysis, Finite Element Analysis (FEA) and Fatigue Analysis.
A HRSG operated by a European client appeared to be subject to excessive vibration, based on high noise near the unit and vibration of the casing in certain sections of the roof. The OEM and EPC had initially agreed that the vibration was a potential problem, so for this reason a study was commissioned by them. This included a field survey of noise using microphones, confirming that there were high noise levels in three different frequencies at some points outside the HRSG casing. Subsequently the OEM/EPC modified their position to hold that the observed noise was not a problem and that no further action was required. The client then requested that Tetra Engineering independently review the problem and perform additional analysis as required. The scope of work included field measurements, thermohydraulic boiler simulations and vibration risk calculations.