Guides techniques

Tetra a publié une série de guides qui peuvent être commandés.

HRSG Inspection Planning Guide (2nd Edition)

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.

HRSG Tube Failure Diagnostic Guide (3rd Edition)

Heat Recovery Steam Generator (HRSG) tubes provide the media for extraction of useful energy from the waste heat in gas turbine exhaust at combined cycle power plants (GT-CCs) or from heat generated by process streams at petrochemical facilities.

Article Techniques

Une sélection de documents techniques disponibles à titre de référence.

Merci ! Votre candidature a été reçue !
Oups ! Une erreur s'est produite lors de l'envoi du formulaire.
Grade 91 Steel

Grade 91 Steel

Background Early failures of components fabricated with Creep Strength Enhanced Ferritic (CSEF) Steels in con...

en savoir plus
Flow Accelerated Corrosion (FAC)

Flow Accelerated Corrosion (FAC)

Background Tube thinning caused by flow-accelerated corrosion (FAC) is one of the most frequent causes of fai...

en savoir plus
Reasons for Inspecting

Reasons for Inspecting

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspectio...

en savoir plus
Piping Hangers & Supports

Piping Hangers & Supports

Piping supports and hangers require routine inspection. Interferences with equipment or structures can c...

en savoir plus
Sulphuric Acid Dewpoint Corrosion

Sulphuric Acid Dewpoint Corrosion

The key factor in determining rate of cold-end deposits in HRSGs firing natural gas is the sulphuric acid dew ...

en savoir plus
Surface Replica Testing

Surface Replica Testing

Preparation of surface replicas is considered a type of visual test. It has proven to be a valuable tool...

en savoir plus

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter

Articles, présentations et articles

Sélection d'articles, de présentations et d'articles issus de conférences et d'événements majeurs de l'industrie.

Title
Author
What do HRSG tube failure statistics tell us?
What do HRSG tube failure statistics tell us?What do HRSG tube failure statistics tell us?
Misha Gadher & Mark Taylor
Modern Power Systems
Counterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGs
Counterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGsCounterfeit, Fraudulent and Suspect Items (CFSI) – Steel and HRSGs
Taylor M.
IMechE HRSG User Group 2022
Adapting Existing Thermal Desalination Plants to Produce Hydrogen
Adapting Existing Thermal Desalination Plants to Produce HydrogenAdapting Existing Thermal Desalination Plants to Produce Hydrogen
Malloy J.
2022 World Utilities Congress
Root Cause Failure Investigation of MSCV Drain Failures
Root Cause Failure Investigation of MSCV Drain FailuresRoot Cause Failure Investigation of MSCV Drain Failures
P. Jackson, A. Wholey, E. Tsai and D. Burns
ASME 2022 Pressure Vessels & Piping Conference
Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)
Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)Predicting and Preventing Risk of Vibration Induced Failures in Boilers and Heat Recovery Steam Generators (HRSG)
Fabricius A., Malloy J., Taylor M., Moelling D.
Proceedings of the ASME 2022 Power Conference

Projets Récents

Avec plus de 30 ans d'expérience dans les services de production d'électricité et de vapeur industrielle, Tetra Engineering a une longue histoire de projets.

HRSG Boiler Preservation Study, 2014
Middle East

HRSG Boiler Preservation Study, 2014

A CCGT power plant employed Tetra to perform a review of possible boiler preservation options within the context of the present and planned operating regime. The review relied on information supplied by the plant staff, Tetra field experience and latest industry trends and practices to identify the most promising strategy for preservation. The ideal solution for this client was Dry Layup that is systematically applied when it reaches the end of the standby period. This would require that resulting startup timing meets requirements imposed by the governing network operator.

Thermohydraulic Attemperator Study using PPS&D, 2014
Europe

Thermohydraulic Attemperator Study using PPS&D, 2014

The primary purpose of this study was to validate the effect of an interstage attemperator between two superheaters with respect to the primary superheater and primary reheater outlet steam temperatures. The CCGT in question had already had problems with creep failures of the P91 components, and needed to assure that exit temperatures did not exceed 570°C. Currently, the primary superheater outlet temperatures exceed 600°C at certain loads and the primary reheater temperatures exceed 590°C. Initial results were based on steady-state analysis, while final results included dynamic modeling of cold-, warm- and hot starts, as well as ramp up and ramp down. The study was performed using the software simulation tool PPS&D.

Stress Analysis Study of SH Section, 2014
South East Asia

Stress Analysis Study of SH Section, 2014

A CCGT Power Plant suffered repeated tube failures between 2003 and 2014 in the SH section of their boiler. Failures were exclusively located at the tube-header weld, at varying positions on the tube sheet. The client engaged Tetra Engineering to analyze the problem and simulate the existing stresses during various load conditions. The scope of work included a review of historical failures and metallurgical reports, operational data analysis, Finite Element Analysis (FEA) and Fatigue Analysis.

HRSG Vibration Study, 2013
Europe

HRSG Vibration Study, 2013

A HRSG operated by a European client appeared to be subject to excessive vibration, based on high noise near the unit and vibration of the casing in certain sections of the roof.  The OEM and EPC had initially agreed that the vibration was a potential problem, so for this reason a study was commissioned by them. This included a field survey of noise using microphones, confirming that there were high noise levels in three different frequencies at some points outside the HRSG casing. Subsequently the OEM/EPC modified their position to hold that the observed noise was not a problem and that no further action was required. The client then requested that Tetra Engineering independently review the problem and perform additional analysis as required. The scope of work included field measurements, thermohydraulic boiler simulations and vibration risk calculations.