Guides techniques

Tetra a publié une série de guides qui peuvent être commandés.

HRSG Inspection Planning Guide (2nd Edition)

Inspection is part of routine maintenance for any Heat Recovery Steam Generator (HRSG). Visual inspections are performed at regular intervals in accordance with the requirements of regulatory bodies and insurers.

HRSG Tube Failure Diagnostic Guide (3rd Edition)

Heat Recovery Steam Generator (HRSG) tubes provide the media for extraction of useful energy from the waste heat in gas turbine exhaust at combined cycle power plants (GT-CCs) or from heat generated by process streams at petrochemical facilities.

Article Techniques

Une sélection de documents techniques disponibles à titre de référence.

Merci ! Votre candidature a été reçue !
Oups ! Une erreur s'est produite lors de l'envoi du formulaire.
Water Side Layup

Water Side Layup

The primary reason for choosing wet layup is that the time to restart the boiler is considerably shorter than ...

en savoir plus
Tube Failures related to Layup

Tube Failures related to Layup

Oxygen is a common contaminant in the boiler water that is particularly corrosive to carbon steel. Many ...

en savoir plus
HRSG Preservation

HRSG Preservation

The preservation of the HRSG fluid and steam systems during shutdown periods is an important objective at any ...

en savoir plus
Duct Burners

Duct Burners

Excess air in the gas turbine exhaust allows the combustion of additional fuel via supplemental firing in the ...

en savoir plus
Gas side Layup

Gas side Layup

Gas-side corrosion occurs during shutdown. It is highest in the cold-end tube sections because of the pr...

en savoir plus
HRSG Tube Failure Diagnosis

HRSG Tube Failure Diagnosis

Diagnosis of HRSG tube failure causes is not always straightforward. Sometimes, a relatively clear-cut c...

en savoir plus

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter

Articles, présentations et articles

Sélection d'articles, de présentations et d'articles issus de conférences et d'événements majeurs de l'industrie.

Title
Author
Failure Analysis of SA-213 T91 HRSG Superheater Weld
Failure Analysis of SA-213 T91 HRSG Superheater WeldFailure Analysis of SA-213 T91 HRSG Superheater Weld
Fabricius A., Jackson P., Wholey A.
ASME 2019 Power Conference, July 2019
NFPA 85 HRSG Purge Credit: Option Selection, Benefits, & ROI Evaluation - Case Studies
NFPA 85 HRSG Purge Credit: Option Selection, Benefits, & ROI Evaluation - Case StudiesNFPA 85 HRSG Purge Credit: Option Selection, Benefits, & ROI Evaluation - Case Studies
Jackson P.
Presented at the 7F User Conference, Chicago, IL, USA, May 2019
Lessons Learned from Implementing Covered Piping System Programs at CCGT:s Priorities for Load Following Markets
Lessons Learned from Implementing Covered Piping System Programs at CCGT:s Priorities for Load Following MarketsLessons Learned from Implementing Covered Piping System Programs at CCGT:s Priorities for Load Following Markets
Jackson P.
Presented at the Electric Power Expo, Las Vegas, NV, USA, April 2019
Managing Thermal Quench Damage at Power Plants
Managing Thermal Quench Damage at Power PlantsManaging Thermal Quench Damage at Power Plants
Rosario R.
Power Magazine, April, 2019.
Assuring Pressure Part Manufacturing & Repair Quality - has ticking the box become more important than the end product?
Assuring Pressure Part Manufacturing & Repair Quality - has ticking the box become more important than the end product?Assuring Pressure Part Manufacturing & Repair Quality - has ticking the box become more important than the end product?
Fabricius A., Taylor M., Malloy J.
Inspection-eering Journal, March/April, 2019

Projets Récents

Avec plus de 30 ans d'expérience dans les services de production d'électricité et de vapeur industrielle, Tetra Engineering a une longue histoire de projets.

CFD Analysis of failed 180° Bend, 2013
Middle East

CFD Analysis of failed 180° Bend, 2013

A CFD study on one of the 4th quadrant pipe bends at a thermal power plant steam boiler was performed. The purpose of the analysis was to analyse the change in flow velocity due to an increase in the bend nominal size from 3” to 4”. The connecting pipe run was kept at 3” and standard expander/reducers are used to join the pipe with the bend. Input process parameters were taken from a PPSD model.

LP Economiser Header Failure Analysis, 2010
Middle East

LP Economiser Header Failure Analysis, 2010

The LP economiser lower header on a HRSG ruptured shortly after a diverter damper incident. Tetra was approached by the client to investigate the possible root causes for the rupture. The unit went into single element control at the time of the incident and the LCV cycled through fully open / fully closed positions to maintain the drum level after “shrink”. When the damper re-opened the LCV remained closed as the drum level increased (swell). The economizer temperature increased and there was an associated increase in pressure. The safety valve failed to operate as it was accidentally gagged, causing serious over pressurisation and a burst header.

Nous contacter

Pour discuter de la manière dont nous pouvons vous aider à améliorer les performances de votre usine ou à maintenir sa valeur au fil du temps

Nous contacter