Thermal Plant Simulation
How a High Fidelity Thermal Plant Simulation Package Can Help Your Engineering Group Keep Your Plants at Peak Productivity?
Tetra Engineering and KED are pleased to announce the release of the Power Plant Simulator & Designer Package (PPSD) Version 19.1. PPSD is a state of the art design and analysis/troubleshooting package for nearly any type of thermal power plant. It includes the capability for both steady state and dynamic simulation and analysis and is developed by KED in Germany.
Version 19.1 includes new features for:
For more information about PPSD contact David Moelling at david.moelling@tetra-eng.com (North/South America) or James Malloy at james.malloy@tetra-eng.com (Europe, Middle East, Africa, Asia).
Stay up to date and refer to our large collection of technical white papers and articles
How a High Fidelity Thermal Plant Simulation Package Can Help Your Engineering Group Keep Your Plants at Peak Productivity?
Thermohydraulic simulations can provide detailed heat recovery steam generator (HRSG) data to help determine the root cause of failures, predict the degree of wear from various mechanisms, and assess the overall thermal efficiency of the boilers. In this article, the results obtained from three case studies are presented to show the real-world benefits obtained through thermodynamic simulations.
Tetra Engineering provides a full-scope service for the modelling and operation analysis of all types of natural or forced circulation Power Boiler and HRSGs, including supercritical and once-through designs.